Case Studies

Case Studies

Crash Damage Repair to 158716


Brodie Engineering’s Mobile Response Team undertook crash damage repair in Inverness to ScotRail’s 158716. A new GRP (Glass Reinforced Plastic) mould was installed to original equipment manufacturer design after removing the damaged GRP. The unit also received an exterior repaint to the affected area.

Pictures taken before, during and after the repair took place:



For more information, see our services page or fill out an enquiry form.


Share this case study

View all of our services.

© 2024 Brodie Engineering
Site by SM / Powered by Couch CMS